My dashboard changed to "in production" today. My order timeline is:
- I placed my original order on 3/24/25.
- Modified my config (changed to Tahoe leather, upgrade to SS Pro) on 7/14/25.
- On 9/4/25 received an email from my SA informing me that a batch number is assigned.
- Inquired on 10/6/25, and was told my build was "anticipated" to go into production on 10/19/25.
- Was told on 10/18/25 that the estimated production date changed to 10/28/25.
- Dashboard changed to "in production" on 10/31/25.
My config is GT, white/stealth, 5 seats, 20/21 wheels, Tahoe leather, fully loaded on the options.
All in all, I'm pretty happy to have my vehicle being built in November. I don't really know what the Lucid factory is like during the end-of-quarter push, or even if the cadence changes for them at end of quarter. But I'm happy to have a build that isn't occurring during the end-of-quarter madness.