Use forms.google.com, set up a form to input all of the information, push it directly to a spreadsheet that you share the link with here publicly, but do not allow modifications to the spreadsheet.We can begin taking donations. But in all seriousness, we are looking into a sustainable way to track the Pures. Stay tuned!
Same thing with the form, only allow finalized order dates people to put in an answerIt would make sense only to track the first 100 finalized orders for Pure if at all using the same method used so far just to get a feel. I am reasonably good with spreadsheets but it is too much for manual data entry to track thousands.
Not that I know of. The so called conformation is for the binding agreement.So have people with Pure reservations actually been confirmed now?
Heck, I haven't yet been invited to confirm configuration for my Touring order, and I hope Tourings get done before Pure gets heavily underway!How many Pure reservations have been confirmed?
Unless they actually have 2 more production lines one each for T and P.Heck, I haven't yet been invited to confirm configuration for my Touring order, and I hope Tourings get done before Pure gets heavily underway!
Dreamer! (tm)Unless they actually have 2 more production lines one each for T and P.
Even then I think once all the GT are shipped, that line can be used to finish the remaining backlog of T and a 2nd line makes sense for the high volume basic P no options other than color.Dreamer! (tm)
Probably not until the new plant opens.