Six months without any updates. Surely somebody has heard something.... Looks like there is a building identified, and rumors on-line about opening this summer.
Knowing all the lunatics in this forum, someone is likely to say "Hmmm...that's only 145 miles each way. Maybe I'll take the Air over there and see what's going on."
Knowing all the lunatics in this forum, someone is likely to say "Hmmm...that's only 145 miles each way. Maybe I'll take the Air over there and see what's going on."
The San Jose location is coming along. Eight work trucks (HVAC?) in the large parking lot. Interior has been drywalled and taped, but not textured. No flooring. I'd guess it'll be 3-5 months yet. View attachment 29907 View attachment 29908 View attachment 29909
The San Jose location is coming along. Eight work trucks (HVAC?) in the large parking lot. Interior has been drywalled and taped, but not textured. No flooring. I'd guess it'll be 3-5 months yet. View attachment 29907 View attachment 29908 View attachment 29909