If they manage to start by September 30, and they get to that 60 cars per day number folks are talking about, they could, in theory, knock out the entire Touring reservation list before the end of the year. That's with two major, dumb assumptions, and one more solid assumption, though. 1) That they will be "caught up" on GT, and thus not producing any, or very few, during that period. 2) That Pure won't be started until after Touring is complete. 3) That there are fewer than 5,000 Touring reservations. I think number 1 is possible. 3 is likely. And 2 is less likely. They will probably start a second line for Pure, and that will be mixed into the 60-per-day number. Either way, I could see them being "done" with Touring by March or April of next year.