Was this feature enabled on the latest Air software version 2.9.2?I had a fantastic surprise at a Tesla V3 WAWA station close to my home in Fairfax VA last night. After running a few errands I pulled into the charging area and saw the side charging unit was open, so decided on a whim to charge from 59% to 80. Reached for my iPhone (both my Lucid and Tesla apps are complete with an assigned CC) and I had forgotten it at home, so there I was with no access to my Lucid app, or my Tesla app. Said to myself, “what the heck” got my Lucid adapter out and plugged in anyway. Charging began immediately without having to identify which unit I was using. Amazing. Exactly like Tesla owners get to do when charging, no hassle, just plug in. I charged to 80% at the expected 47kw rate and immediately got an email receipt from Lucid Motors with all the details and cost of the charging that just happened. Completely hassle free. Hurrah for Lucid software team! Progress is being made.
This capability already existed, from Lucid: “Lucid’s Plug & Charge (via Lucid Charging Services) allows your vehicle to communicate directly with compatible public chargers like Electrify America, automatically initiating the session and processing billing through your saved credit card without opening an app or using a physical payment card.”Was this feature enabled on the latest Air software version 2.9.2?
I remember hearing of someone who did, and got the same charging speeds as you would expect at a competent 350kW 920V CCS charging station....I was really hoping to find out if anyone here as charged at a true V4 supercharger with V4 cabinets and if so, what charging rate did they experience....
The Air is limited to 50kW at V3 stations (short cable V3 pedestals and 450 Volt V3 power cabinets, 250kW) and V3.5 stations (long cable V4 pedestals and 450 Volt V3 cabinets, 325 kW).Tesla app show stations with 325 kW and 250 kW. Will the Lucid Air be limited to 50 kW at the 250 kW stations? Charge at 325 kW at 325 kW stations?
The Air is limited to 50kW at V3 stations (short cable V3 pedestals and 450 Volt V3 power cabinets, 250kW) and V3.5 stations (long cable V4 pedestals and 450 Volt V3 cabinets, 325 kW).
It will charge at its full capability at V4 stations (long cable V4 pedestals and 1000 Volt V4 cabinets, up to 500kW).