- Joined
- Dec 20, 2024
- Messages
- 224
- Reaction score
- 167
Didn't know it but when I stopped to charge over the weekend at the EA in Waterford, CT, little did I know it was one of only two of these pilot stations in the US. I chose it because it was high speed (350kw) and there were 6 stations. On the outbound route, I charged with zero issues, including plug and charge, which is amazing. On the way back, my first attempt resulted in an error, possible defective connector. Second station showed as out of service eventhough it worked for the prior car. Third station was fine, and fast. I know they're still working out the kinks but overall I really liked it. Dual NACS / CCS charging connectors, and each charger can support two cars / spots (4 connectors and cables total). I think EA is really onto something here with this speed and layout.