mnewber1
Active Member
- Joined
- Jan 22, 2022
- Messages
- 1,512
- Cars
- Air Touring
- DE Number
- 0
Deliveries to start no later than Q2 2023 makes it sound like Pure orders being delivered around that time will be pushed back for priority of these vehicles.
And that's why today was a perfect buying opportunity
Deliveries to start no later than Q2 2023 makes it sound like Pure orders being delivered around that time will be pushed back for priority of these vehicles.
Which I did late in the day @ $17.69And that's why today was a perfect buying opportunity
I got in slightly higher @17.75 =*(Which I did late in the day @ $17.69
I just wish I had bought more now.I got in slightly higher @17.75 =*(
Probably will go down on May 5th...I didn't buy today. Thought it would go down more tomorrow
Maybe! That's why I hedged and split half for today and save the rest for May 5th!Probably will go down on May 5th...
I was feeling bad about buying it on 4/22 @ 18.98 when it dropped today, but decided to further lower by cost basis average by buying more today. Still feel a possibility of another dip on 5/5 but this announcement will keep it up in this range. As I said in an earlier post, could test the $16.12 post-spac low but more upside than downside at this point, in my opinion.Ugh, I got it at $17.94...
Well, I also bought at $26 or so...I was feeling bad about buying it on 4/22 @ 18.98 when it dropped today, but decided to further lower by cost basis average by buying more today. Still feel a possibility of another dip on 5/5 but this announcement will keep it up in this range. As I said in an earlier post, could test the $16.12 post-spac low but more upside than downside at this point, in my opinion.
How are Pure orders being pushed back? The initial commitment is 1000 to 2000 annually until 2025. I'm sure they can slot these in with the Touring and Pure production runs with minimal impact
Deliveries to start no later than Q2 2023 makes it sound like Pure orders being delivered around that time will be pushed back for priority of these vehicles.
How are Pure orders being pushed back? The initial commitment is 1000 to 2000 annually until 2025. I'm sure they can slot these in with the Touring and Pure production runs with minimal impact